Prototypes & NPI
Design inputs / Pilot-build preparation
- Build inputs
- Sample findings
- Revision actions
What we bring into the work
Bring design files, components, enclosure fit, and supplier questions into the next prototype or pilot-build review.
Electronics, mechanical fit, testing, and assembly. Connected around your next build.
DFM · Design for Manufacturing
Four connected areas.
One design-to-build review.
Fabrication and assembly inputs, component availability, layout constraints, and access for inspection.
Assembly sequence, fixtures, handling, and test access against the proposed manufacturing route.
Electrical connections, connector clearance, mounting, and the fit between board, cable, and enclosure.
Enclosures, materials, tooling inputs, final assembly, and the checks required for the next build.
Electronics DFM is a core focus. BOM availability and testability checks can be scoped alongside it. Mechanical and enclosure reviews involve specialist partners where required.
Reviews are scoped and quoted before engineering work begins. Design revisions, prototype builds, specialist testing, and additional review rounds are included only where specified.
Findings and recommendations are delivered in English, with technical clarifications coordinated through Vexera.
Connected capabilities

Board → Enclosure → Checks → Assembly
Electronics engineering, PCB/PCBA DFM, BOM review, and board-build preparation.
Enclosure, mounting, fit, and manufacturing reviews coordinated with specialist mechanical partners.
Electrical and functional checks, approved firmware programming, and inspection records. Explore testing & programming ↗
Prototype and product assembly, with production work allocated to suitable manufacturing partners.
Our lab and project engineering network connect the disciplines each build needs.
Explore the engineering networkStart with a defined review, build, or production scope.
Design inputs / Pilot-build preparation
Bring design files, components, enclosure fit, and supplier questions into the next prototype or pilot-build review.
Components / PCB-PCBA / Assembly / QC
Vexera can organize component supply and manufacturing for an agreed build, with defined testing and delivery responsibilities. QC at an existing supplier can also be scoped separately.
Agree tasks, deliverables, checks, and technical owners before the build.
Roles & approvalsA short, non-confidential overview is enough.
Initial reply within 2 business days.